1 April 2017
On Saturday a large crane lifted the new bicycle bridge over the Singel in Berchem. The bicycle bridge is 45 metres long and was delivered in two parts weighing 110 tonnes each transported on a truck. Although in place the bridge cannot yet be used. The contractor still has to finish the bicycle bridge and assemble the connections. Read more
* Source: Gazet van Antwerpen