Description of the work:
- Works along and under two-lane carriageway
- Along the N136 the construction of new connection to an existing dry weather sewer
- Along and under the N18 renewal of the existing pressure line and removal of old pipeline under the bridge over the canal
- Demolition of existing sewer water cleaning installation incl. inlet and outlet pipes
- Construction of settling tanks and pumping station
- Renewal of supply and drainage system
- Removal of existing pressure line in asbestos cement under the bridge and in the verges.
- Laying new pressure pipeline by drilling and trenching along the N18.