Description of the work:
- Completion of topographical work
- Probing for underground piping
- Clearing trees
- Breaking up paved surfaces and their foundations
- Earthworks for construction of new roadway
- Laying concrete piping including earthworks
- Construction of an outlet structure on the Stenengracht
- Siphoning of a duct by the demolition of existing vaulting including restoration with new duct
- Laying foundations
- Construction of traffic platform and traffic islands
- Rainwater drainage home connections and the connection of the gullies to the new pipeline
- Laying of a carriageway with concrete surfacing
- Local repair of footpaths and cycle paths at home connections